Traffic

Drill Team
Evergreen Rodeo Parade

The road through downtown Evergreen will be closed from 9:45AM until the last float has made its way through the entire parade route.  On-street parking downtown will not be available until after the parade, so please allow ample time to walk to the parade route.  Carpooling is recommended.

No vehicles will be allowed to leave the downtown area until the CSP and Sheriff have given the all clear and re-opened highways 73 & 74.  There will absolutely be no exceptions.  The downtown merchants will have entertainment and merchandise sales until the roads are open, which is expected by 1:00PM. 

Barricades will in place at Upper Bear Creek Rd., Douglas Park Rd. at Main Street, Forest Hill Rd. at Main Street, South Independence Trail at Main Street. 

DETOURS AROUND PARADE ROUTE:

DOWNTOWN EVERGREEN DETOUR: Meadow Drive is open to traffic in both directions, between Evergreen Parkway and Main Street (CO 74).

UPPER BEAR CREEK DETOUR: Road Closure at Upper Bear Creek at Lakepoint Center. Detour is from Evergreen Parkway on Stagecoach Drive to Witter Gulch and Upper Bear Creek Road.  This detour will NOT get you through downtown Evergreen.  It WILL get you to the Evergreen Golf Course and the Lakehouse Center.

 

HIGHWAY 73 DETOUR (passenger cars only): Eastbound from Hwy. 73 just west of Buffalo Park Rd. light: Little Cub Creek to Mountain Park Rd., then Trinchera Trail and Independence Trail to the east end of Evergreen, Hwy. 74 – to Kittridge/Morrison, Hwy. 285, E470. Westbound from Hwy. 73 and Meadow Dr. at the Transfiguration Church: Independence Trail to Trinchera Trail, then Mountain Park Rd. to Little Cub Creek to Camel Heights Rd. to the west end of Evergreen, Hwy. 73 – to Conifer, Turkey Creek Rd., Hwy, 285.  

NOTE: No big rigs or large trucks/vehicles are to access the Highway 73 detour, only passenger cars.